Most platforms offer dashboards. Few deliver intelligence. Use this 25-criteria checklist, the same one Zerowatt's engineers use in every evaluation, to tell the difference before you sign.
The Evaluation Gap
Why Most Factories Choose the Wrong Platform
Energy platforms are marketed on dashboards and integrations. But what separates a platform that pays back in months from one that collects dust?
Data ≠ Intelligence
Most systems give you charts. Very few tell you which equipment is wasting energy, why, and what to do about it. Without an intelligence layer, a monitoring platform becomes an expensive data logger.
Integration is the Hidden Risk
Every factory already has PLCs, SCADA, and manual logbooks. A platform that can’t reuse existing sensors forces a rip-and-replace project, adding months to deployment and significant cost to the budget.
Adoption Decides ROI
Platforms that don’t fit existing workflows (reports in familiar formats, alerts via WhatsApp or email, mobile access) simply don’t get used. Low adoption = low ROI, regardless of the technology.
Compliance is Accelerating
SEBI’s BRSR already requires the top 1,000 listed companies to report Scope 1 and 2 emissions, voluntary value-chain disclosures have begun for the top 250, and the Carbon Credit Trading Scheme now sets emission-intensity targets for energy-intensive sectors. A platform that can’t automate emissions accounting will require a second system and manual reconciliation.
Criteria 1–5 · Sensor & Integration
Sensor & Integration: What to Demand from Day One
Integration problems are a common reason energy monitoring projects stall after purchase. These five criteria determine whether a platform will slot into your facility or fight it.
Criteria 6–9 · Dashboard Features
Dashboard Features: What Every Operator Needs to See
A strong dashboard does more than display numbers. It shows how power flows, where costs accumulate, and when demand is about to spike. These four criteria separate platforms that inform from those that simply display.
Criteria 10–12 · Equipment Intelligence
Asset-Level Visibility: Catching Waste Before It Compounds
Most energy waste is invisible at the facility level. These three criteria test whether the platform can isolate inefficiency to the individual asset and alert the right person before it costs you.
Criteria 13–16 · Usability & Access
Adoption Decides ROI: Criteria That Keep the Platform in Use
A technically superior platform that nobody uses delivers zero ROI. These four criteria test whether the platform fits real workflows, for operators on the shop floor and managers in the boardroom.
Criteria 17–20 · Advanced Dashboards
Beyond the Basics: Criteria That Unlock Hidden Value
Power quality, shift-team performance, multi-site views, and speed at scale are often absent from entry-level platforms. These four criteria separate a full-stack energy intelligence system from a basic monitoring tool.
Criteria 21–25 · AI & Intelligence
5 Intelligence Tests Every Platform Must Pass
“AI-powered” is one of the most overused claims in industrial software. These five criteria cut through the marketing and test whether the intelligence layer actually drives action.
Financial Justification
Build Your Business Case: ROI Calculator
A rigorous business case beats gut feel every time. Use the calculator below to model your expected returns, then stress-test with conservative and optimistic scenarios.
Quick ROI Estimator
Default reflects Zerowatt's 20–30% average reduction in energy costs. Actual results depend on facility baseline and implementation quality.
Establish Your Baseline
Collect 12 months of utility bills and any available sub-meter data. Calculate energy intensity (kWh per unit of output). This becomes your M&V baseline.
Estimate Savings Potential
Savings vary widely by plant and starting point; Zerowatt customers average a 20–30% reduction in energy costs. Apply a conservative 15% to your annual energy bill for the initial business case.
Calculate Total Cost of Ownership
Include hardware, software licence, implementation, training, and Year 2+ support. Insist vendors break out Year 1 vs. Year 2 costs. Hidden renewal fees are a common trap.
Apply M&V Protocol
Use IPMVP Option B (equipment-level) or Option C (whole-facility). Ensure the platform supports automated M&V reporting so savings are auditable, not estimated.
Next Step
See How Zerowatt Scores on Your 25-Point Checklist
Skip the sandbox. We'll run a live assessment against your actual energy data and return a prioritised savings roadmap. No commitment required.
100+ large industrial facilities across India · 20–30% average reduction in energy costs, with payback in under 6 months


